Aboveground Tank, Vessel & Piping Inspections in Nashville, TN

We inspect aboveground storage tanks, pressure vessels and process piping in Nashville and across Middle Tennessee. Send us your inspection request, and we’ll help confirm the scope.

Or call 866-954-2915

Certified inspectors
API 653, API 510, API 570 and STI SP001

A written report for every job
Findings, thickness data and next-inspection dates

Inspectors nationwide
All 50 states, Canada and Mexico

What we inspect

Inspections for Nashville-area facilities

We inspect tanks, pressure vessels and piping at fuel and asphalt terminals, manufacturing plants and other sites in Davidson, Williamson, Sumner, Wilson, Rutherford and Maury counties.

Petroleum bulk terminals and asphalt terminals operate at several sites across Nashville. Auto assembly plants operate in Rutherford and Maury counties. API 653 commonly applies to larger field-erected steel tanks; STI SP001 commonly applies to shop-built and certain smaller field-erected tanks.

Whatever your equipment stores, our inspections find corrosion and other damage early, so you can plan maintenance and stay on schedule.

Tennessee requirements to plan around

  • SPCC plans. A facility may need an SPCC plan if its total aboveground oil storage capacity is more than 1,320 gallons, counting only containers of 55 gallons or more, and a spill could reach waterways. The plan’s inspection program usually follows API 653 or STI SP001. EPA rule (40 CFR 112.1)
  • Fire-code tank permits. Within Metro Nashville, the fire code is the 2024 International Fire Code with Metro’s amendments. It requires a permit to install, alter, remove or abandon a flammable or combustible liquid tank, and another to take an aboveground tank of those liquids out of service for more than 90 days. Before a permit is issued, the fire chief or a delegate inspects and approves the storage. Outside Metro, check with the local fire and codes departments; the State Fire Marshal’s Office has adopted the 2021 edition, which has the same two permits. Metro Nashville Code (ch. 10.64)

What you receive and how to start

Every inspection ends with a written report: findings, thickness data and recommended next-inspection dates, ready for your SPCC plan or integrity program.

  1. Tell us what you have. Rough details are fine. You do not need to know which standard applies.
  2. We confirm the scope and send a quote.
  3. A certified inspector comes to your site.
  4. You receive the written report.

Our inspectors hold API 653, API 510, API 570 and STI SP001 certifications, our NDT technicians are certified, and our crews are OSHA 10, 30 and 40-hour trained. We are based near Kansas City, MO, with a network of inspectors serving all 50 states, Canada and Mexico. Our inspectors’ certifications · Where we work · Tank inspection across Tennessee

Frequently asked questions

Do I need to know which standard applies before asking for a quote?

No. Tell us what the equipment is, what it stores and roughly how big it is. We will confirm whether API 653, STI SP001, API 510, API 570 or your SPCC plan sets the scope.

Does Metro Nashville inspect a fuel tank before issuing a fire permit?

Yes. Within Metro Nashville, the fire chief or a delegate inspects and approves the storage before a fire-code permit is issued, and the Fire Marshal’s Office asks for operational permit applications at least 15 business days before the inspection date. That includes the permit to take an aboveground fuel tank out of service for more than 90 days, so plan the outage, the permit and our inspection together. The approval rests with the Fire Marshal’s Office; our API 653 and STI SP001 reports are condition records that office and your facility can review.

Request an inspection quote

Send what you have; we will help with the rest. Helpful details:

  • The tanks, vessels or piping, with approximate size or capacity
  • What each one stores, and whether it is in service
  • Your last inspection report, if you have one
  • The site location and your timing