Aboveground Tank, Vessel & Piping Inspections in Tulsa, OK

We inspect aboveground storage tanks, pressure vessels and process piping in Tulsa and the surrounding area. Send us your inspection request, and we’ll help confirm the scope.

Or call 866-954-2915

Certified inspectors
API 653, API 510, API 570 and STI SP001

A written report for every job
Findings, thickness data and next-inspection dates

Inspectors nationwide
All 50 states, Canada and Mexico

What we inspect

Inspections for Tulsa-area facilities

We inspect tanks, pressure vessels and piping at refineries, fuel terminals, port facilities and other industrial sites in Tulsa County and neighboring Rogers County.

Refineries operate just southwest of downtown Tulsa, and petroleum bulk terminals operate within the city. Northeast of the city, the Tulsa Port of Catoosa ships petroleum products and other cargo by barge, rail and truck, and fuel terminals and a nitrogen fertilizer plant operate near it in Rogers County. API 653 commonly applies to larger field-erected steel tanks; STI SP001 commonly applies to shop-built and certain smaller field-erected tanks.

Whatever your equipment stores, our inspections find corrosion and other damage early, so you can plan maintenance and stay on schedule.

Oklahoma requirements to plan around

  • SPCC plans. A facility may need an SPCC plan if its total aboveground oil storage capacity is more than 1,320 gallons, counting only containers of 55 gallons or more, and a spill could reach waterways. The plan’s inspection program usually follows API 653 or STI SP001. EPA rule (40 CFR 112.1)
  • Fire-code tank permits. Within the City of Tulsa, the fire code ordinance adopts the 2018 International Fire Code with local amendments. It requires a construction permit to install, alter, remove or abandon a flammable or combustible liquid tank, and Tulsa adds an operational permit to remove or close one. Tulsa Revised Ordinances (Title 14)
  • OCC tank registration. Aboveground tanks holding fuel, motor oil or antifreeze at bulk plants must be registered with the Oklahoma Corporation Commission’s Petroleum Storage Tank Division, as must those with a capacity of 2,100 gallons or greater at fleet and commercial sites. Cities may adopt their own tank codes if they are at least as stringent as the state’s rules. Oklahoma rule (OAC 165:26)

What you receive and how to start

Every inspection ends with a written report: findings, thickness data and recommended next-inspection dates, ready for your SPCC plan or integrity program.

  1. Tell us what you have. Rough details are fine. You do not need to know which standard applies.
  2. We confirm the scope and send a quote.
  3. A certified inspector comes to your site.
  4. You receive the written report.

Our inspectors hold API 653, API 510, API 570 and STI SP001 certifications, our NDT technicians are certified, and our crews are OSHA 10, 30 and 40-hour trained. We are based near Kansas City, MO, with a network of inspectors serving all 50 states, Canada and Mexico. Our inspectors’ certifications · Where we work · Tank inspection across Oklahoma

Frequently asked questions

Do I need to know which standard applies before asking for a quote?

No. Tell us what the equipment is, what it stores and roughly how big it is. We will confirm whether API 653, STI SP001, API 510, API 570 or your SPCC plan sets the scope.

Do we need a city fire permit to take a Tulsa tank out of service for an internal inspection?

If the outage will run more than 90 days, yes. Within the City of Tulsa, the fire code requires an operational permit to place an aboveground flammable or combustible liquid tank temporarily out of service for more than 90 days. If the outage may run that long, check with the Tulsa Fire Department’s Fire Prevention Division before the tank comes out of service, and plan the outage, the permit and our inspection together. Our API 653 and STI SP001 reports document the tank’s condition for the facility’s records.

Request an inspection quote

Send what you have; we will help with the rest. Helpful details:

  • The tanks, vessels or piping, with approximate size or capacity
  • What each one stores, and whether it is in service
  • Your last inspection report, if you have one
  • The site location and your timing