Aboveground Tank, Vessel & Piping Inspections in Richmond, VA

We inspect aboveground storage tanks, pressure vessels and process piping in Richmond and the surrounding counties. Send us your inspection request, and we’ll help confirm the scope.

Or call 866-954-2915

Certified inspectors
API 653, API 510, API 570 and STI SP001

A written report for every job
Findings, thickness data and next-inspection dates

Inspectors nationwide
All 50 states, Canada and Mexico

What we inspect

Inspections for Richmond-area facilities

We inspect tanks, pressure vessels and piping at fuel and asphalt terminals, power stations, chemical plants and other industrial sites in Richmond and Henrico, Chesterfield and Hanover counties.

Fuel and asphalt terminals operate in the City of Richmond, and more fuel terminals in Henrico and Chesterfield counties. Power stations in Chesterfield, Henrico and Hanover counties keep fuel oil or diesel in aboveground tanks, and chemical, fiber and film plants operate in Chesterfield County. API 653 commonly applies to larger field-erected steel tanks; STI SP001 commonly applies to shop-built and certain smaller field-erected tanks.

Whatever your equipment stores, our inspections find corrosion and other damage early, so you can plan maintenance and stay on schedule.

Virginia requirements to plan around

  • SPCC plans. A facility may need an SPCC plan if its total aboveground oil storage capacity is more than 1,320 gallons, counting only containers of 55 gallons or more, and a spill could reach waterways. The plan’s inspection program usually follows API 653 or STI SP001. EPA rule (40 CFR 112.1)
  • Formal tank inspections. At facilities that can hold one million gallons of oil or more, tanks need formal inspections to API 653 or STI SP001. Newly installed tanks have their first formal inspections within five years. After that, external inspections are generally every five years, and internal inspections every 10 years for tanks of 12,000 gallons or more; DEQ can shorten or extend the internal interval. The inspector must be certified under API 653, STI SP001 or a DEQ-approved procedure. Virginia rule (9VAC25-91-130)
  • Fire code. Virginia’s Statewide Fire Prevention Code requires tanks to be maintained in accordance with NFPA 30, which calls for steel storage tanks to be inspected and maintained to API 653 or STI SP001, whichever applies. The City of Richmond and Henrico, Chesterfield and Hanover counties each enforce it through their own fire marshal’s office. Virginia rule (13VAC5-52-540)

What you receive and how to start

Every inspection ends with a written report: findings, thickness data and recommended next-inspection dates, ready for your SPCC plan or integrity program.

  1. Tell us what you have. Rough details are fine. You do not need to know which standard applies.
  2. We confirm the scope and send a quote.
  3. A certified inspector comes to your site.
  4. You receive the written report.

Our inspectors hold API 653, API 510, API 570 and STI SP001 certifications, our NDT technicians are certified, and our crews are OSHA 10, 30 and 40-hour trained. We are based near Kansas City, MO, with a network of inspectors serving all 50 states, Canada and Mexico. Our inspectors’ certifications · Where we work · Tank inspection across Virginia

Frequently asked questions

Do I need to know which standard applies before asking for a quote?

No. Tell us what the equipment is, what it stores and roughly how big it is. We will confirm whether API 653, STI SP001, API 510, API 570 or your SPCC plan sets the scope.

Does a Richmond tank facility need a fire-code permit?

Within the City of Richmond, the Fire Marshal’s Office requires an annual operational permit to store, handle or use Class I liquids above 5 gallons in a building or above 10 gallons outside one, and to operate a pipeline that carries flammable or combustible liquids within a facility. The application includes a site plan for outdoor storage. In Henrico, Chesterfield and Hanover counties, check with the county fire marshal’s office. The permit rests with the fire marshal; our API 653 and STI SP001 inspection reports are condition records that office and your facility can review.

Request an inspection quote

Send what you have; we will help with the rest. Helpful details:

  • The tanks, vessels or piping, with approximate size or capacity
  • What each one stores, and whether it is in service
  • Your last inspection report, if you have one
  • The site location and your timing